-
videomancer/1.0.2-rc.8 Pre-release
released this
2026-11-05 00:33:52 +00:00 | 0 commits to main since this releaseVideomancer 1.0.2-rc.8
Eighth release candidate for 1.0.2. Everything from 1.0.2-rc.7 is carried over.
Flash the full UF2 and use official program library 1.0.11 with LZX Connect
1.3.10 or newer.Fixed since 1.0.2-rc.7
- H Phase Out reaches far enough to clear a vertical bar — sending the RGB
outputs into another device that takes its timing from Sync Out, such as an
ESG3, could leave a blank vertical bar in the picture that H Phase Out could
move but not remove, because the trim only reached about 4.7 microseconds at
NTSC. The value now goes up to +860 px, in steps of 8 above +63 px, which is
nearly a full SD line. If you see the bar, raise H Phase Out until it leaves
the screen. Saved settings keep their value, and the menu entry works in
every route mode. - Pinwheel's Colorize switch — it was inverted, so Off discarded the
input's colour, and On rotated neutral chroma, which has no hue to rotate.
Off now keeps the input's colour and On gives a brightness-to-colour map.
Pinwheel is now version 1.0.1. - Video outputs recover when VSYNC stops but the input stays locked — the
program is now reloaded once. Before, the outputs stayed off until a program
change or a power cycle.
Carried from 1.0.2-rc.7
video statusreports the HDMI receiver's raw timing (hdmi_rx).- The preset screen closes on the next knob or switch.
- Bitcullis is in colour again; every modulation Gain and Depth knob is
a bipolar attenuverter.
Known issues
- Switching program folders can lose the screen until a power cycle.
Reported on 1.0.2-rc.5 and cleared by going back to 1.0.1. The VSYNC recovery
above may or may not help; this cause has not been found. Please report which
went away, the panel display or the video output.
Status
- Not yet run on the desk unit. Host tests pass and Pinwheel builds in all
eight video configurations and was checked in simulation. The H Phase Out
change has not been checked with a scope or an ESG3.
Requires
- Flash 1.0.2-rc.8 UF2 (full image).
- Install official program library 1.0.11 with LZX Connect.
- LZX Connect 1.3.10 or newer.
- Turn on Show pre-releases in Connect to see this candidate.
Report feedback at
/instruments/videomancer/beta.Downloads
-
Source code (ZIP)
0 downloads
-
Source code (TAR.GZ)
0 downloads
-
videomancer-1.0.2-rc.8.uf2
24 downloads · 24 MiB
- H Phase Out reaches far enough to clear a vertical bar — sending the RGB