Mechanical and electrical specification for EuroRack modules, enclosures, and accessories.
Find a file
creatorlars 58a13f68af
All checks were successful
EIS checks / checks (push) Successful in 2m23s
EIS checks / deploy (push) Has been skipped
Annex K / L: a rotary switch's position 1 exactly left of it (nine o'clock), the rest clockwise at its detent pitch; heavy-outlined output columns are valid
Lars 2026-11-15. K.3: the switch's stop set so its pointer stands at nine o'clock at position 1, the positions clockwise
at the detent pitch (30 degrees for a twelve-position switch such as the SR1712F). L.9: each position on its detent's
ray, as near the knob as the hardware margin and the least gap allow, no farther than 10.6 mm. L.4: where the positions
reach within 30 degrees of the legend's side, the legend steps a half step out (0.4375 in), as a centred knob's does.
L.5: a heavy outline (2 tk, five outputs or more) is a full output mark, as valid as a fill; its names print in ink;
only fill counts toward the fifth. The pictograms card's rotary switch redrawn to the rule.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-15 10:34:15 -08:00
.forgejo/workflows The PDF is the one deliverable: annotated, indexed, searchable; the design references go; no change log, no withdrawn rows; V75 renumbered. 2026-10-20 19:37:37 -07:00
annex Annex K / L: a rotary switch's position 1 exactly left of it (nine o'clock), the rest clockwise at its detent pitch; heavy-outlined output columns are valid 2026-11-15 10:34:15 -08:00
data Annex L: 0.375 in plates on columns 0.4 in apart; a normal down a column (chain or bus, the manual says) 2026-11-14 23:56:57 -08:00
figures Annex K / L: a rotary switch's position 1 exactly left of it (nine o'clock), the rest clockwise at its detent pitch; heavy-outlined output columns are valid 2026-11-15 10:34:15 -08:00
fonts Annex L (front-panel legends and artwork) and Annex M (the LZX Panel Stroke typeface) 2026-11-13 10:00:01 -08:00
spec Desk sweep 2026-11-02: commit uncommitted work (data/claim.schema.json data/register.lock.json data/requirements.json data/video_75.json figures/video-75-star.svg spec/requirements.md spec/video-75.md tools/claim.py tools/video_75.py ) 2026-11-02 12:25:22 -08:00
tests Annex L: conventions of six product families' panels folded in 2026-11-13 12:44:31 -08:00
tools Annex K / L: a rotary switch's position 1 exactly left of it (nine o'clock), the rest clockwise at its detent pitch; heavy-outlined output columns are valid 2026-11-15 10:34:15 -08:00
.gitattributes fonts/: binary, so the Annex M downloads keep the bytes their SHA-256 names 2026-11-13 10:00:21 -08:00
.gitignore Publication kit: pyproject with pinned tooling and the eis command, a README for strangers, edition pre.9. 2026-10-17 13:37:08 -07:00
CONTRIBUTING.md No profiles: VIDEO is a signal class beside AUDIO and CV. Chapter 7 is 7.1 patch jacks, 7.2 signal classes (AUDIO, CV, VIDEO, PITCH, GATE, TRIG, CLOCK in one table; CV B5 by default, U1 on the VIDEO scale), 7.3 video signals; Part 3 the optional interfaces (8.1 DC, 8.2 video sync ports, 8.3 timing); Part 4 assembly (chapter 9). A claim names the product type alone: EIS draft, module. SIG-018 removed; the mark carries no cell. 2026-10-24 09:44:35 -07:00
COPYRIGHT.md Annex L (front-panel legends and artwork) and Annex M (the LZX Panel Stroke typeface) 2026-11-13 10:00:01 -08:00
LICENSE Phase 2: six parts, the final renumber, the names of Phase 0, and frozen identifiers. 2026-10-19 21:40:33 -07:00
LICENSE-CODE Add requirements register, profiles, EuroSynth alignment, and module survey (Annex G) 2026-10-14 15:06:48 -07:00
pyproject.toml The PDF is the one deliverable: annotated, indexed, searchable; the design references go; no change log, no withdrawn rows; V75 renumbered. 2026-10-20 19:37:37 -07:00
README.md Annex L (front-panel legends and artwork) and Annex M (the LZX Panel Stroke typeface) 2026-11-13 10:00:01 -08:00
standard.json Phase 2: six parts, the final renumber, the names of Phase 0, and frozen identifiers. 2026-10-19 21:40:33 -07:00

Eurorack Interface Specification (EIS)

EIS is a free, open specification for Eurorack hardware. It says what modules, enclosures, bus boards, power supplies, and cables owe each other so that products from different makers fit, power up, and patch together. A rule is a shall only where two products would otherwise fail to work together; everything else is written "EIS recommends". Every requirement has an identifier, the product types it applies to, and a machine-readable model behind it.

Read it: lzxindustries.net/eis has the PDF, the machine-readable models, and every clause as a web page with a URL for each requirement. In this repository, start at Scope, or, to design a product, at the designer's guide.

Claim it: a product states its product type on one line, EIS draft, module, and can keep what it publishes in a claim file, which eis claim eis-claim.yaml validates.

Change it: open an issue or a pull request at git.lzxindustries.net/lzx/eurorack-specification. CONTRIBUTING.md says what belongs in EIS and how a change is made; a proposal for a new shall names the two products that would stop working together without it.

Identifier EIS
Status Working draft
Edition v0.1.0
Maintainer LZX Industries
License CC BY 4.0 on the specification, MIT on the tooling; details in COPYRIGHT.md
SPDX CC-BY-4.0 (specification), MIT (code)

Document map

Clause Page Read it when you design
Foreword spec/foreword.md Edition, status, public review
1 Scope spec/scope.md
2 Normative references spec/normative-references.md
3 Terms spec/terms.md The words with a special meaning
4 Conformance spec/conformance.md Core, product types, the claim file
4.4 Requirements register spec/requirements.md Every requirement, generated
5.1 Rack dimensions spec/rack.md The 19-inch frame a row sits in
5.2 Modules spec/modules.md, front panels, boards A module, its panel, or its boards
5.3 Rails, inserts, and mounting screws spec/rails.md What makes a panel fit a row
5.4 Enclosures spec/enclosures.md The case a module mounts in
6.1 Power architecture spec/power-architecture.md The power interfaces, sources, distribution, entries, and the rules for every power interface
6.2 Power supplies spec/power-supplies.md Protection, published ripple, the ripple limit of each power interface
6.3 Grounding and 0 V spec/grounding.md The 0 V reference, protective earth, and joining cases
6.4 The bus spec/bus-power.md PWR-BUS: rails, header, pinout, marking, keying, and a module on the bus
6.5 Bus boards spec/bus-boards.md Capacity, links, ribbons
6.6 Bus CV and gate spec/bus-cv-gate.md The 16-pin CV and gate nets
7.1 Signals spec/signals.md The port list, patch safety, and the jacks inside the case
7.2 Signal classes spec/signal-classes.md The seven signal classes, AUDIO, CV, VIDEO, PITCH, GATE, TRIG, and CLOCK, and their ranges
7.3 Video signals spec/video-signals.md VIDEO on patch jacks: levels, impedances, path kinds, and bandwidth
8.1 12 V DC power (PWR-DC12) spec/dc-12.md PWR-DC12: a barrel or multi-pin DC entry and the DC rail it feeds
8.2 Video on 75 Ω coaxial jacks (VID-75) spec/video-75.md The 75 Ω coaxial interface: the video sync ports COAX-IN, COAX-OUT, COAX-THRU, the video sync tree, and the coaxial cable
8.3 Video timing spec/video-timing.md The formats a video sync port lists
9 Assembling a system spec/assembly.md The rules for whoever fits a row together
Annexes A to M annex/ Informative: verification, planning aids, worked examples, and the Doepfer comparison
Bibliography spec/bibliography.md

Machine-readable models

data/ holds the register and every normative number: requirements.json, the mechanical models, signals.json, video_timings.json, video_75.json, power_interfaces.json, power_ribbon.json, and dc_12.json. A product's claim file follows data/claim.schema.json; the examples are in data/examples/.

The market survey and the catalog rail sections and inserts are in the separate eis-reference repository. They are informative and size nothing EIS requires. Third-party documents are not stored here; data/sources.json records where each cited one was retrieved.

Tooling

pip install -e ".[build,test]" installs one command, eis:

Command Does
eis check Runs every generator and check (python -m pytest tests)
eis gen Rewrites the generated pages, tables, and figure cards
eis build pdf, site, or all Builds build/eis.pdf and the static site
eis claim FILE Validates a claim file and prints its claim line and the register rows the product owes
eis claim --mark OUT.svg FILE Also writes the product's EIS mark

Every subcommand is a script under tools/. The figure cards in figures/ share one house style, tools/card.py. CI builds the PDF and the site on every push; a tag vX.Y.Z (an edition) or vX.Y.Z-rc.N (a review candidate) publishes them at lzxindustries.net/eis (CONTRIBUTING.md).